FABRICATION AND INSTALLATION OF CLINKER SILO WITH STORAGE CAPACITY OF 50,000 TONS IN LESS THAN 120 DAYS

Installation Method: Reverse assembly and hydraulic lifting silo specification: Diameter: 34.5 Meters Elevation of last ring: 36.0 Meters Elevation of crown: 48.0 Meters Weight of crown and roof: 160 Meters Ring place thickness from 13 to 32 MM Total weight: 850 Tons Advantages of lifting system:
1- Time: The time for installation lifting system is only 4 months.
2- Quality: All assembly and welding done on ground level, hence improving quality.
 

  MANUFACTURING OF HOT GAS STORAGE TANKS
FOR MEYBOD STEEL COMPLEX

  Height: 42 Meters
  Diameter: 6.2 Meters
  Completion: 12 months
  Weight: 600 Metric Tons
  Electricity: less than 12 MM Plate thickness: 20-40 MM
 

 

STEEL STRUCTURE OF 16 STORY TOWER

Location: Kish island
Weight: 4055 tons
Completion time: 18 months
Total area: 40000 Square Meters

 
DAILY BIN, STORAGE BIN, AND MATERIAL TRANSPORT SYSTEM, ESFAHAN STEEL MILL

Manufacturing and installation of direct reduction plant for Esfahan steel mill
* Daily bin
* Storage bin
* Material transport system
* Chimneys
* De dusting scrubbers
Project completion time: 4 months
Tonnage: 2200 Metric tons.
 
 
MANUFACTURING AND INSTALLATION OF FOOD INDUSTRIES: MILK POWDER EQUIPMENT

* Spray dryers
* Evaporators
* Cyclone
* Ejectors
* Atomizers
* Cooling Bunkers
- All parts are stainless steel.
Project completion time: 4 months
Tonnage: 250 Metric tons
 
 
Note:
If you like to see the list of our recent project please click here.
 
Photos:
 
Copyright © 2003 Esfahan Machinery Manufacturing Company
Optimized for IE6.0+ with 1024x768 Screen Resolution
Page Design by Pezhvak Electronics